Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Alanjari, P, RazaviAlavi, S and AbouRizk, S (2015) Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown. Journal of Construction Engineering and Management, 141(10).

de Athayde Prata, B, Pitombeira-Neto, A R and de Moraes Sales, C J (2015) An Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams. Journal of Construction Engineering and Management, 141(10).

  • Type: Journal Article
  • Keywords: Precast concrete beams; Production planning; Integer linear programming; Quantitative methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000991
  • Abstract:
    Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory. Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor for the success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective of this paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that this problem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production loss of a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scale instance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on the CPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may be achieved in terms of reduction of planning time through the application of the proposed model.

de Oliveira, A L and Prudêncio, L R (2015) Evaluation of the Superficial Texture of Concrete Pavers Using Digital Image Processing. Journal of Construction Engineering and Management, 141(10).

Heravi, G and Eslamdoost, E (2015) Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. Journal of Construction Engineering and Management, 141(10).

Ma, G, Gu, L and Li, N (2015) Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling. Journal of Construction Engineering and Management, 141(10).

Shealy, T and Klotz, L (2015) Well-Endowed Rating Systems: How Modified Defaults Can Lead to More Sustainable Performance. Journal of Construction Engineering and Management, 141(10).

Song, J, Song, D and Zhang, D (2015) Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects. Journal of Construction Engineering and Management, 141(10).